6/16/06 - Friday


MLA Seeding Work

Notes

  • C+C prepped last night so Chris all set to get up today and head out to Poocham.
  • Ants a prob but can't do diatomaceous til tomorrow. Spraying essential oil mix.
  • Cass sick, miserable. Mega bugs and humidity.
  • Chris back later than would like. Made multiple trips uphill. Hauling water up driveway exhausting!

202.00 Clean hell house

  • Plumber came to fix HW leak upstairs
  • Kitchen floor stripped of old AFM hardseal
  • time: 2 hrs

303.13 Finish Woody Way diversion ditches

  • this task done now, can seed it
  • time: 0.25hr

276.05 Grade, remove plants and seed w/clover: MLA to US

  • time: 3.5hr

276.06 Seed banks/ditches along WoodyWay

  • time: 0.5hr

303.06 Fix Moose and Rain related bank destructions and re-seed

  • this task prob ok to call done.
  • the main moose bank damage was fixed earlier in wk, depressions he left throughout non-bank seeded swaths will eventually even out or at least not make too much erosion potential
  • the mudslide behind woodshed was fixed and reseeded earlier
  • when working on MLA seeding today, reviewed banks along springline.
  • Reseeded some and calling it OK for this season - mostly need plants to take hold.
  • Time: negligible, done while doing other tasks